Closed design of the 5th batch member sizes and materials of BRAC University new campus project
(Brac University, 2019-04-01)
Progress of the work, BRACU new campus development project
(Brac University, 2018-03-25)
VO #015 Revised proposal of 500mm Dia bored pile works rev. 01
(Brac University, 2019-12-17)
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
(Brac University, 2019-06-23)
Substation of claim from 23th April 2018 to 30th June 2018 due to defective diaphragm wall
(Brac University, 2018-08-07)
Reply to letter having reference number BUCG-ABC JV/BRACU/24/18 dated 28th April 2018
(Brac University, 2018-05-03)
Letter about income tax return problem for short challan
(Brac University, 2019-11-06)
Reasons for replacing brand of waterproof materials of BRAC University new campus project
(Brac University, 2019-01-20)
Re-rectification of D-wall
(Brac University, 2018-10-30)
Removal of precast piles
(Brac University, 2018-10-08)