Welcome to the upgraded BRAC University Institutional Repository. We are currently organizing collections after a recent system upgrade. Homepage category counters may temporarily show lower numbers while syncing, but over 27,000 repository items remain safe and accessible. Please use the search bar to find theses, scholarly outputs, and institutional documents.

Post procurement review to assess the extent of value for money following Public Procurement Act-2006, Public Procurement Rules-2008 in the public procurement process: a case studies of some selected procurement contracts of Local Government Engineering Department (LGED)

bracu.type.groupStudent Works
dc.contributor.advisorBiswas, Samir
dc.contributor.authorIslam, Md. Fakhrul
dc.contributor.departmentBRAC Institute of Governance and Development
dc.date.accessioned2026-02-02T06:20:51Z
dc.date.available2026-02-02T06:20:51Z
dc.date.copyright2025
dc.date.issued2025-09
dc.descriptionThis internship report is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2025.en_US
dc.descriptionCataloged from PDF version of internship report.
dc.descriptionIncludes bibliographical references (page 30).
dc.description.abstractThis study evaluates the extent of Value for Money (VfM) achieved in procurement practices of the Local Government Engineering Department (LGED), focusing on compliance with the Public Procurement Act (PPA) 2006 and the Public Procurement Rules (PPR) 2008. Post Procurement Review (PPR) serves as a critical mechanism for ensuring accountability, transparency, efficiency, and effectiveness in the use of public resources in Bangladesh. The study examined seven procurement contracts drawn from three major LGED projects: Construction of Important Bridges on Rural Roads (Phase II), Resilient Infrastructure for Adaptation and Vulnerability Reduction (RIVER), and Greater Dhaka Rural Infrastructure Improvement Project-3 (GDP-3). These contracts, covering goods, works, services, and consultancy, were implemented through a variety of methods including RFQ, OTM, LTM, OSTETM, DPM, and ICS. The findings highlight a mixed picture of performance. Routine and low-value contracts demonstrated strong compliance with PPR-2008, timely completion, and in several cases, measurable cost savings, reflecting efficiency and effective contract management. In contrast, high-value and technically complex works contracts were marked by delays in evaluation and implementation, weak competition, cost overruns, and inadequate enforcement of contractual provisions such as Liquidated Damages. Furthermore, incomplete documentation and insufficient justification for non-competitive procurement methods weakened overall transparency and accountability. The study concludes that LGED has developed considerable strength in managing routine procurement activities but faces systemic weaknesses in handling high-value and complex contracts. Addressing these challenges requires stricter enforcement of compliance mechanisms, better cost estimation, stronger market engagement to enhance competition, and greater reliance on digital platforms such as e-GP to improve efficiency and transparency. Capacity building of procurement officials and more robust monitoring systems are also essential to reduce irregularities and delays. Overall, the study underscores that effective application of PPA-2006 and PPR-2008, supported by institutional reforms and improved procurement governance, is crucial for ensuring that LGED’s procurement activities consistently deliver Value for Money and contribute to sustainable development outcomes in Bangladesh.en_US
dc.description.degreeMasters in Procurement and Supply Management
dc.description.statementofresponsibilityMd. Fakhrul Islam
dc.format.extent115 pages
dc.identifier.otherID 23282010
dc.identifier.urihttp://hdl.handle.net/10361/27525
dc.language.isoenen_US
dc.publisherBRAC Universityen_US
dc.rightsBRAC University internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.
dc.subjectValue for moneyen_US
dc.subjectPublic procurement act 2006en_US
dc.subjectPublic procurement rules 2008en_US
dc.subjectLocal Government Engineering Departmenten_US
dc.subjectLGEDen_US
dc.subjectProcurement complianceen_US
dc.subjectProcurement policyen_US
dc.subjectPost procurement reviewen_US
dc.subjectPPRen_US
dc.subject.lcshGovernment purchasing--Law and legislation--Bangladesh.
dc.subject.lcshPublic contracts--Bangladesh.
dc.subject.lcshGovernment purchasing--Case studies.
dc.subject.lcshBangladesh. Local Government Engineering Department.
dc.titlePost procurement review to assess the extent of value for money following Public Procurement Act-2006, Public Procurement Rules-2008 in the public procurement process: a case studies of some selected procurement contracts of Local Government Engineering Department (LGED)en_US
dc.typeInternship Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
23282010_BIGD.pdf
Size:
1.06 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: