Comprehensive bridge asset management in LGED

bracu.degree.levelPostgraduate
bracu.type.groupStudent Works
datacite.rightsOpen Access
dc.contributor.advisorRahman, Mir Mehbubur
dc.contributor.authorHossain, Farukh
dc.contributor.departmentBRAC Institute of Governance and Development
dc.date.accessioned2026-04-27T07:01:04Z
dc.date.available2026-04-27T07:01:04Z
dc.date.copyright2025
dc.date.issued2025-04
dc.descriptionThis internship report is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2025.en_US
dc.descriptionCataloged from PDF version of internship report.
dc.descriptionIncludes bibliographical references (pages 41-42).
dc.description.abstractThe Local Government Engineering Department (LGED) is committed to enhancing the quality of life in rural Bangladesh by developing and maintaining critical infrastructure. As one of the country’s largest public-sector engineering organizations, LGED oversees an extensive network of approximately 335,000 bridges spanning 1,700,000 meters, ensuring improved access to essential services, markets, and economic opportunities. To optimize financial planning, maintenance, and long-term sustainability, LGED has introduced a Bridge Asset Management System (BAMS). The Bridge Asset Management Plan (BAMP) provides a structured framework for managing LGED’s bridge assets throughout their lifecycle, covering planning, acquisition, operation, maintenance, rehabilitation, and decommissioning. The plan aims to enhance rural-urban connectivity, support economic growth, create employment, and reduce poverty by ensuring a well-maintained and efficient bridge network. Since its inception in the 1960s under the Rural Works Program, LGED has progressively expanded its infrastructure initiatives. By the 1990s, it began systematically managing bridge assets, yet funding limitations led to a growing maintenance backlog. To address this, LGED launched a targeted maintenance program in 2018, with support from the World Bank and the Government of Bangladesh, ensuring strategic rehabilitation and upkeep of bridges based on actual maintenance needs. A data-driven, systematic approach underpins LGED’s bridge asset management strategy. High-quality asset data enables precise monitoring, lifespan assessment, service level development, and targeted maintenance planning. By integrating modern inspection methods and trend analysis, LGED optimizes resource allocation, mitigates risks, and enhances infrastructure resilience. Through BAMS and BAMP, LGED is strengthening Bangladesh’s transportation network, fostering socio-economic development, and aligning national growth objectives with community needs. This initiative ensures that rural and urban populations benefit from a safe, reliable, and sustainable bridge infrastructure, supporting long-term national progress.en_US
dc.description.degreeMasters in Procurement and Supply Management
dc.description.statementofresponsibilityFarukh Hossain
dc.format.extent53 pages
dc.identifier.otherID 23382004
dc.identifier.urihttp://hdl.handle.net/10361/28092
dc.language.isoenen_US
dc.publisherBRAC Universityen_US
dc.rightsBRAC University internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.
dc.subjectLocal Government Engineering Departmenten_US
dc.subjectInfrastructure developmenten_US
dc.subjectBridge asset management systemen_US
dc.subjectBridge assetsen_US
dc.subjectTransportation networksen_US
dc.subjectRural-urban connectivityen_US
dc.subject.lcshBangladesh. Local Government Engineering Department.
dc.subject.lcshBridges--Bangladesh--Maintenance and repair.
dc.subject.lcshInfrastructure (Economics)--Management.
dc.subject.lcshLife cycle costing.
dc.subject.lcshEngineering economy.
dc.subject.lcshIndustrial management--Bangladesh.
dc.subject.lcshBridges--Risk management--Bangladesh.
dc.subject.lcshBridges--Equipment and supplies.
dc.titleComprehensive bridge asset management in LGEDen_US
dc.typeInternship Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
23382004_BIGD.pdf
Size:
714.58 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: