Search
Now showing items 81-90 of 206
Assembly list sheet 6_Rev A
(Brac University, 2023-02-06)
Beam slab wall column of 4th floor of BRAC University new campus project
(Brac University, 2022-12-30)
Instruction about R5 railing and updating architectural and structural drawing
(Brac University, 2022-08-07)
Roof floor slab, beam and column
(Brac University, 2021-02-15)
AST 1 plan & section of BRAC University new campus project
(Brac University, 2022-12-30)
10th new classroom sections and details_Rev A
(Brac University, 2023-02-06)
Assembly list sheet 9_Rev A
(Brac University, 2023-02-06)
4th column section and detail-sheet 3_Rev A
(Brac University, 2023-02-06)
Drawing list of steel structure as-built drawing_ Rev A
(Brac University, 2023-02-06)
ST 2 plan & details of BRAC University new campus project
(Brac University, 2022-12-30)