Search
Now showing items 11-20 of 643
Regarding test result as well as visual inspection report on the fire protection pipes
(Brac University, 2022-06-14)
Quotation for ceramic tiles installation works VO#38
(Brac University, 2022-03-12)
Regarding site cleaning, keeping healthy environment at the BRACU project site
(Brac University, 2020-06-12)
Clarification about scope of intumescent paint
(Brac University, 2020-03-04)
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub clause 8.1 & 15.1
(Brac University, 2020-02-18)
Instruction to keep provision for Davit Arm
(Brac University, 2020-09-03)
Reply to letter having reference number BUCG-ABC JV/BRACU/24/18 dated 28th April 2018
(Brac University, 2018-05-03)
Initial observation on price offer for facade work (variation order #031)
(Brac University, 2020-06-20)
Status of metal railing work
(Brac University, 2022-05-25)
Submitting final design, drawing, specification and BOQ for the BBT
(Brac University, 2020-01-26)