Browsing Brac University New Campus Development Project by Title
Now showing items 1367-1386 of 2622
-
Observation on delivered pipes and engineer’s instruction to arrange test from BUET
(Brac University, 2022-05-10) -
Observation on MEP design submission by BUCG
(Brac University, 2020-07-15) -
Observation on overall progress and present condition of project site of BRAC University new campus project
(Brac University, 2018-04-30) -
Observation on pre-cast RCC sunshade slab under VO#031
(2020-07-12) -
Observation on the electrical design drawings and BoQ
(Brac University, 2020-01-14) -
Observation on the mock-up of some of the finishing work done on 7F
(Brac University, 2021-12-11) -
Observation regarding the concrete surface quality of roof slab & preparation of mock-up
(Brac University, 2019-09-16) -
Obstacles in different floors to do the brickwork by NS Construction
(Brac University, 2022-05-26) -
Obstacles in different floors to do the brickwork by NS Construction
(Brac University, 2022-05-26) -
Offer to do the fire protection coating at increased quantity of BOQ item no.10.2
(Brac University, 2020-12-03) -
Omitting waterproofing work in some areas of BRAC University new campus project
(Brac University, 2022-01-06) -
Opening L/C for importing pre-engineering steel sections under item no. 5.2.3 of BoQ
(Brac University, 2018-11-07) -
Opportunities and facilities to other contractors
(Brac University, 2021-11-13) -
Opportunities and facilities to other contractors of BRAC University new campus project
(Brac University, 2021-11-20) -
Other quotations of instrumentation and monitoring work by the third party
(Brac University, 2018-11-15) -
Other structure of auditorium wall, fins and lecture theatre of BRAC University new campus project
(Brac University, 2022-12-30) -
Other structure of lecture theatre auditorium fins of BRAC University New Campus Project for RAJUK
(BRAC University, 2023-09-19) -
Our subcontractors are looking for your cooperation at site
(Brac University, 2022-05-30) -
Outcome of finished surface of CC3 and CC5 and few other observations
(Brac University, 2021-11-02) -
Outstanding design conditions as of 27 April, 2020
(Brac University, 2020-04-27)