Search
Now showing items 461-470 of 498
Clarification regarding VO # 09 & 10
(Brac University, 2019-10-01)
The engineer's instruction to provide the wall and floor penetration,opening, sleeve,groove etc. as per drawings
(Brac University, 2019-07-17)
Minutes of 12th technical and progress monitoring (TPM) meeting of BRACU new campus (session I)
(Brac University, 2019-03-09)
The 12th TPM (session-l) meeting was held at 10:00 AM on 09 March 2019 with Mr. A.S.M Rashidul Hai, Project Director, BRACU new campus project in the Chair. The Chair welcomed all participants and commenced the business ...
Quotations for the extra works listed in the letter BRACU-NCP/2019/89A, dated 06th August 2019
(Brac University, 2019-09-08)
Minutes of 21st technical and progress monitoring (TPM) meeting of BRACU new campus (session II)
(Brac University, 2019-09-30)
The 21st TPM meeting was held at 11:00 AM on 30 September 2019 with Mr. A.S.M Rashidul Hai, Project Director, BRACU new campus project in the Chair. The Chair welcomed all participants and commenced the business of the meeting.
Cushion replacement in the second reinforcement bracing base course
(Brac University, 2019-01-27)
The engineer's observation and instruction regarding the concreting works at utility portion
(Brac University, 2019-07-14)
Response to the letter for amendment of depth of earth excavation
(Brac University, 2019-03-13)