Weekly progress report of BRAC University new campus project
(Brac University, 2019-03-14)
Engineer's instruction to construct draining box around building ground
(Brac University, 2019-10-12)
The engineer's instruction
(Brac University, 2018-11-13)
Claims for stacking and handing of anti-seismic steel bar
(Brac University, 2019-11-12)
Observation regarding the concrete surface quality of roof slab & preparation of mock-up
(Brac University, 2019-09-16)
The engineer’s observation and instruction regarding the quality of works
(Brac University, 2019-05-13)
Letter to Chairman of ABC Ltd.
(Brac University, 2018-06-27)
Setting up of testing laboratory at project site
(Brac University, 2018-09-25)
Opening L/C for importing pre-engineering steel sections under item no. 5.2.3 of BoQ