Search
Now showing items 11-20 of 42
The impact of failure to perform the design contract of BRAC University new campus project
(Brac University, 2021-04-22)
Entrance & box drain ( Box drain drawing)
(Brac University, 2022-09-07)
4th floor decking slab
(Brac University, 2020-01-05)
Request meeting for resolving the performance problem of the design contract of BRAC University new campus project
(Brac University, 2021-03-24)
5th floor decking slab
(Brac University, 2020-01-19)
9th floor slab, beam and column
(Brac University, 2020-12-04)
Roof floor slab, beam and column
(Brac University, 2021-02-15)
Request of closing the outstanding issues of design services of BUCG
(Brac University, 2021-06-30)