Welcome to the upgraded BRAC University Institutional Repository. We are currently organizing collections after a recent system upgrade. Homepage category counters may temporarily show lower numbers while syncing, but over 27,000 repository items remain safe and accessible. Please use the search bar to find theses, scholarly outputs, and institutional documents.

Improving risk management strategy in public procurement and supply chain of PWD

bracu.type.groupStudent Works
dc.contributor.advisorHasan, Md. Mahmudul
dc.contributor.advisorIslam, Shah Eyamin Ul
dc.contributor.authorBaksh, Ashef Ainan
dc.contributor.departmentBRAC Institute of Governance and Development
dc.date.accessioned2024-12-02T05:18:22Z
dc.date.available2024-12-02T05:18:22Z
dc.date.copyright2022
dc.date.issued2022-09
dc.descriptionThis internship report is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2022.en_US
dc.descriptionCataloged from PDF version of internship report.
dc.descriptionIncludes bibliographical references (page 22).
dc.description.abstractSupply chain is the major term in an organisation that includes the delivery of raw materials from supplier to manufacturer and the path of finished product to reach from manufacturer to the end user. In every steps of supply chain there is a probability of numerous kinds of risks (both internal and external). The main theme of this report is to find out the major risks on procurement and supply chain process of Public Works department. The main method of generating findings and results is questionnaire survey. For questionnaire survey 28 questions were prepared and 21 respondents who are working in different offices (from Assistant Engineer to Executive Engineer) answered the questions. Major findings from this survey is that during the tender preparation stage pre-bid meetings time for mitigating the ambiguity of tender proposal, timely payment can reduce time and cost overrun. Insurance coverage can transfer the risk from the contractors to the insurance company, auditing of payment should be done properly. Major recommendations from this report that should be implemented by the key personnel of PWD is that feasibility study must be done for analysing the risks, proper risk management plan must be generated prior to commence of a project, insurance must be ensured as per PCC of the contracts, structural and architectural drawings must be provided on time during construction phase, market should be properly analysed for mitigating cost overrun and every project office must maintain risk register from beginning to the end of project. It is expected that this report will help to improve the risk management strategies and efficiency to overcome external and internal risks of Public Works Department.en_US
dc.description.degreeMasters in Procurement and Supply Management
dc.description.statementofresponsibilityAshef Ainan Baksh
dc.format.extent23 pages
dc.identifier.otherID 20382013
dc.identifier.urihttp://hdl.handle.net/10361/24849
dc.language.isoenen_US
dc.publisherBRAC Universityen_US
dc.rightsBrac University internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.
dc.subjectSupply chain managementen_US
dc.subjectPWDen_US
dc.subjectRisk management strategyen_US
dc.subjectGovernment procurementen_US
dc.subject.lcshRisk management.
dc.subject.lcshPublic procurement--Bangladesh.
dc.titleImproving risk management strategy in public procurement and supply chain of PWDen_US
dc.typeInternship Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
20382013_BIGD.pdf
Size:
1.35 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: