Welcome to the upgraded BRAC University Institutional Repository. We are currently organizing collections after a recent system upgrade. Homepage category counters may temporarily show lower numbers while syncing, but over 27,000 repository items remain safe and accessible. Please use the search bar to find theses, scholarly outputs, and institutional documents.

A case study on addressing sustainability in DBO contract for reconstruction, expansion and operation of Pagla STP under Dhaka sanitation improvement project, Dhaka WASA

dc.contributor.advisorBiswas, Samir
dc.contributor.authorMiah, Mohammad Salim
dc.contributor.departmentBRAC Institute of Governance and Development
dc.date.accessioned2026-04-27T10:09:04Z
dc.date.available2026-04-27T10:09:04Z
dc.date.copyright2025
dc.date.issued2025-04
dc.descriptionThis practicum report is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2025.en_US
dc.descriptionCataloged from PDF version of practicum report.
dc.descriptionIncludes bibliographical references (page 20).
dc.description.abstractDhaka, the capital city of Bangladesh, faces significant challenges in wastewater management, with existing sewerage facilities covering only 20% of its population. Dhaka Water Supply and Sewerage Authority (WASA) has undertaken an initiative to bring the core city area into a planned sanitation system- the reconstruction and expansion of Pagla STP is a part of that plan. This practicum report explores the integration of sustainability principles in the Design-Build-Operate (DBO) Contract by assessing the incorporation of environmental, social, and economic sustainability and providing recommendations for improving contract structuring and long-term sustainability in wastewater infrastructure projects. The study also identifies gaps in Pagla STP's existing DBO contract and proposes strategies to enhance efficiency and sustainability throughout the project lifecycle. The methodology adopted in this study includes a qualitative and analytical approach, with data collected through literature reviews, key informant interviews (KIIs), stakeholder consultations, field observations, and focus group discussions (FGDs). Comparative analysis and SWOT assessments were used to benchmark the sustainability performance of the Pagla STP against similar projects globally. Key findings highlight the sustainable design and operational features of the Pagla STP, such as: • Water Quality Improvement: The project aims to treat 200 million liters per day (MLD) of sewage, significantly reducing pollution in the Buriganga River and improving aquatic ecosystems. • Greenhouse Gases (GHG) Reduction: The project incorporates anaerobic digestion to capture methane and generate biogas, which will be used for power generation, thereby reducing environmental impact. • Energy Efficiency and Renewable Energy Use: The plant will utilize energy-efficient motors, LED lighting, and solar power for 10% of its total lighting load, enhancing energy sustainability. • Sludge Management: Anaerobic digestion will reduce sludge volume by approximately 30%, lowering disposal costs and promoting circular economy principles. • Community Benefits: The installation of modern odor control systems will improve air quality, while the provision of a septage decanting station will extend sanitation services to hard-to-reach areas. • Carbon Footprint Reduction: The project is expected to result in a net emission reduction of -605,466 tCO2-eq, aligning with global climate goals. The study concludes that the DBO contract structure effectively integrates sustainability measures, enhancing environmental protection, social equity, and economic viability. Recommendations include refining contract documents to further incentivize sustainable practices, strengthening stakeholder engagement, and incorporating advanced technologies for enhanced resource recovery. By implementing these measures, the Pagla STP project can serve as a model for future sustainable wastewater infrastructure projects in Bangladesh and beyond.en_US
dc.description.degreeMasters in Procurement and Supply Management
dc.description.statementofresponsibilityMohammad Salim Miah
dc.format.extent31 pages
dc.identifier.otherID 23382005
dc.identifier.urihttp://hdl.handle.net/10361/28102
dc.language.isoenen_US
dc.publisherBRAC Universityen_US
dc.rightsBRAC University practicum reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.
dc.subjectGreenhouse gasen_US
dc.subjectEnergy efficiencyen_US
dc.subjectDhaka WASAen_US
dc.subjectCircular economyen_US
dc.subjectPagla Sewage Treatment Planten_US
dc.subjectDesign-Build-Operateen_US
dc.subjectWastewater managementen_US
dc.subjectSanitation projecten_US
dc.subject.lcshWater treatment plants--Bangladesh--Management.
dc.subject.lcshSewage--Purification--Environmental aspects--Bangladesh.
dc.subject.lcshSanitation--Bangladesh.
dc.subject.lcshSewage disposal plants--Bangladesh.
dc.subject.lcshSewage--Purification--Energy conservation--Bangladesh.
dc.titleA case study on addressing sustainability in DBO contract for reconstruction, expansion and operation of Pagla STP under Dhaka sanitation improvement project, Dhaka WASAen_US
dc.typePracticum reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
23382005_BIGD.pdf
Size:
379.74 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: