2019
Permanent URI for this collectionhttps://hdl.handle.net/10361/19485
Browse
Recent Submissions
listelement.badge.dso-type Item , Piping material for conduiting work in audio visual, PA, IT and security access(Brac University, 2019-12-26) Brac Universitylistelement.badge.dso-type Item , Structural steel works from 6th to 12th floor(Brac University, 2019-12-24) Brac Universitylistelement.badge.dso-type Item , Issuing NCR (Non-conformance report) for BRACU new campus project(BRAC University, 2019-12-24) Brac Universitylistelement.badge.dso-type Item , VO#20 Approval of unit rates for rebar welding works connected to plate of steel column(Brac University, 2019-12-18) Brac Universitylistelement.badge.dso-type Item , Preparing master schedule – BRACU new campus project(Brac University, 2019-12-17) Brac Universitylistelement.badge.dso-type Item , Resubmission of VO # 09 for steel structure works(Brac University, 2019-12-17) Brac Universitylistelement.badge.dso-type Item , Construction of strengthening wall attached to diaphragm wall(Brac University, 2019-12-14) Brac Universitylistelement.badge.dso-type Item , Piping material for audio visual & PA, IT system. security access control system works(Brac University, 2019-01-14) Brac Universitylistelement.badge.dso-type Item , Construction of shore pile in zone C(Brac University, 2019-12-14) Brac Universitylistelement.badge.dso-type Item , Plaster on the strengthening wall(Brac University, 2019-12-10) Brac Universitylistelement.badge.dso-type Item , List of RFA which are pending comment concurrence from EMCS(Brac University, 2019-12-07) Brac Universitylistelement.badge.dso-type Item , Providing material samples for the structure construction, pre-opening and pre-embedding works(Brac University, 2019-12-07) Brac Universitylistelement.badge.dso-type Item , Submission of monthly progress report (MPR)(Brac University, 2019-12-05) Brac Universitylistelement.badge.dso-type Item , Submission of updated master schedule(Brac University, 2019-01-05) Brac Universitylistelement.badge.dso-type Item , Consideration in the electrical system design work(Brac University, 2019-12-04) Brac Universitylistelement.badge.dso-type Item , VO.22 – Approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works’(Brac University, 2019-11-25) Brac Universitylistelement.badge.dso-type Item , Submitting inspection checklist for concreting, structural steel and other major works(Brac University, 2019-11-20) Brac Universitylistelement.badge.dso-type Item , Submitting revised offer for the variation order # 09 and # 10(Brac University, 2019-11-18) Brac Universitylistelement.badge.dso-type Item , Claims for stacking and handing of anti-seismic steel bar(Brac University, 2019-11-12) Brac Universitylistelement.badge.dso-type Item , The engineer's observation and instruction regarding health of the personnel(Brac University, 2019-11-09) Brac University