BUCG-ABC Joint Venture (BUCG-ABC JV)2023-09-032023-09-03©20192019-11-02Ref. no.: BUCG-ABC JV/BRACU/126/19http://hdl.handle.net/10361/20452This record consists of general correspondence regarding the engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A) of BRAC University new campus project.1 pageenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectGeneral correspondenceEngineer’s instructionEscalatorRectificationThe engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)General correspondence