BUCG-ABC Joint Venture (BUCG-ABC JV)2023-08-312023-08-31©20202020-07-02Ref.: BUCG-ABC JV/BRACU/105/20http://hdl.handle.net/10361/20288This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building.1 pageenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectGeneral correspondenceTime extension6th floor8th floorIFC drawingsTime extension of design change for 6th-8th floorGeneral correspondence