Brac University2023-08-272023-08-27©20222022-12-26No.: BRACU-NCP/2022/130Ahttp://hdl.handle.net/10361/19995This record consists of general correspondence regarding the clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by university authority and pumps delivered by the contractor at BRACU new campus project site.1 pageenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectGeneral correspondenceHorizontal split case pumpEnd suction pumpClarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project siteGeneral correspondence