Electro-Mechanical Control Services (EMCS)2023-10-022023-10-02©20192019-04-20Design no.: MP-P.11Design no.: MP-P.24DDesign no.: MP-P.29BDesign no.: MP-P.29Dhttp://hdl.handle.net/10361/21479This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings.Plumbing layout of 5th storey plan; Toilet blow-up of south riser-03 (AT3) at 4th storey plan; Toilet (AT1) pipe shifting of 5th storey ceiling (south riser-05); Toilet (AT2) pipe shifting of 5th storey ceiling (south riser-05)3 pagesenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectMEP designMEP drawingPlumbing designsPlumbing drawingConsultant drawing5th storey planAT1AT2AT3ToiletPlumbing layout of 5th storey planDrawings