Electro-Mechanical Control Services (EMCS)2023-10-022023-10-02©20192019-04-20Design no.: MP-P.12Design no.: MP-P.25Design no.: MP-P.26Design no.: MP-P.27Design no.: MP-P.28Design no.: MP-P.29Design no.: MP-P.29ADesign no.: MP-P.29Chttp://hdl.handle.net/10361/21477This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings.Plumbing layout of 6th storey plan; Toilet blow-up of north riser-01 (Typical); Toilet blow-up of north riser-02 (Typical); Toilet blow-up of north riser-03 (Typical); Toilet blow-up of north riser-04 (Typical); Toilet blow-up of north riser-05 (Typical); Toilet (AT1) blow-up of 6th storey plan (south riser-05); Toilet (AT2) blow-up of 6th storey plan (south riser-05)3 pagesenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectMEP designMEP drawingPlumbing designsPlumbing drawingConsultant drawing6th storeyToiletAT1AT2Plumbing layout of 6th storey planDrawings