Brac University2023-08-232023-08-23©20212021-12-11No.: BRACU-NCP/2021/063A-3http://hdl.handle.net/10361/19631This record consists of general correspondence regarding the punches of walls and slabs with work scope of supply, installation, testing and commissioning of substation, HT panel, LT panel and BBT system for BRACU new campus project.1 pageenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectGeneral correspondenceWallsSlabsSubstationBBT systemHT panelLT panelPunches in the walls and slabs are being kept as per submitted drawingGeneral correspondence