WOHA Designs PTE LTDBUCG-ABC Joint VentureWeb Structures2023-10-052023-10-05©20212021-07-16Ref.: RFA-426_Rev Ahttp://hdl.handle.net/10361/21639This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.Roof architectural finishes; Roof floor finishes schedule (West wing); Roof wall finishes schedule (West wing; Roof floor finishes schedule (East wing); Roof wall finishes schedule (East wing) ; Roof storey reflected ceiling (East wing); RF floor & wall & ceiling finishes;enThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permissionNew campus projectArchitectural drawingsArchitectural designsContractor shop drawingRoof architectural finishes (RFA-426_Rev A)Drawings