BUCG-ABC Joint Venture (BUCG-ABC JV)2023-09-192023-09-19©20222022-10-19Ref. no.: RFA / 544_Ahttp://hdl.handle.net/10361/21029This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.Updated 6F-12F floor finish; Revised drawing about floor finish (6-9F); Revised drawing about floor finish (10-12F)4 pagesenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectArchitectural drawingsArchitectural designsContractor shop drawingFloor finish planUpdated 6F-12F floor finish (RFA-544_Rev.A)Drawings