Electro-Mechanical Control Services (EMCS)2023-10-022023-10-02©20192019-04-20Design no.: MP-P.04Design no.: MP-P.04ADesign no.: MP-P.22http://hdl.handle.net/10361/21489This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings.Plumbing layout of basement-02; Sump collection layout for basement-02; Basement-01 driver's toilet drainage pipe shifting layout at basement-02 ceiling3 pagesenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectMEP drawingMEP designPlumbing designsPlumbing drawingConsultant drawingBasementDrainage systemPlumbing layout of basement-02Drawings