Brac University2023-08-242023-08-24©20202020-03-02Ref. no.: BRACU-NCP/2020/036Ahttp://hdl.handle.net/10361/19812This record consists of general correspondence regarding initial observation on the BMS system design drawings and BOQ of BRAC University new campus project.2 pagesenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectGeneral correspondenceBMS systemBoQBill of QuantitiesInitial observation on the BMS system design drawings and BOQGeneral correspondence