BUCG2023-09-072023-09-07©20202020-12-12Ref.: BUCG/BRACU/008/20http://hdl.handle.net/10361/20655This record consists of general correspondence regarding the M&E designs that are deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020 for BRACU new campus project.2 pagesenThis document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission.New campus projectGeneral correspondenceM&E designMDB systemBBT systemCoordinated drawingBMS systemSwimming poolM&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020General correspondence