Welcome to the upgraded BRAC University Institutional Repository. We are currently organizing collections after a recent system upgrade. Homepage category counters may temporarily show lower numbers while syncing, but over 27,000 repository items remain safe and accessible. Please use the search bar to find theses, scholarly outputs, and institutional documents.

Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle.

Loading...
Thumbnail Image

Publisher

BRAC University

Citation

Abstract

The world is modernizing day by day. With the pace of this modernization, every industry is trying to adopt digital process or appliances. So as in construction industry also. The accuracy and safety are given the most priority in construction industry. Now this has become easier to detect clash or problems by using software. For a high-rise building construction, elevator is one of the important product for doing the life easy. There is a connection between building design and construction and elevator. Standard size elevators ensure qualitative service as those are determined after several testing. In Bangladesh context, there arise conflicts regarding space and other criteria of elevator as most of the clients approach to the elevator suppliers at the finishing stages of building construction. This research highlights the advantages of supplier involvement in design phase and proposes a way of integration of end consumer to supplier.

Description

This dissertation is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2021.
Cataloged from PDF version of dissertation.
Includes bibliographical references (page 27).

Publisher Link

Type

Dissertation