VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure
| dc.contributor.author | Brac University | |
| dc.date.accessioned | 2023-08-27T04:37:32Z | |
| dc.date.available | 2023-08-27T04:37:32Z | |
| dc.date.copyright | ©2022 | |
| dc.date.issued | 2022-10-24 | |
| dc.description | This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building. | en_US |
| dc.format.extent | 12 pages | |
| dc.identifier.other | No.: BRACU-NCP/2022/115A | |
| dc.identifier.uri | http://hdl.handle.net/10361/19864 | |
| dc.language.iso | en | en_US |
| dc.publisher | Brac University | en_US |
| dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
| dc.subject | New campus project | en_US |
| dc.subject | General correspondence | en_US |
| dc.subject | Auditorium structure | en_US |
| dc.subject | Gallery | en_US |
| dc.title | VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure | en_US |
| dc.type | General correspondence | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- VO#52 Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure - 24.10.22.pdf
- Size:
- 7.04 MB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: