Assessing readiness of health facilities for hypertension and integration with diabetes care in Bangladesh: Evidence from the National Service Provision Assessment Survey

bracu.type.groupResearch Publications
datacite.rightsOpen Access
dc.contributor.authorJisan, Jannat-E-Mim
dc.contributor.authorRahman, Mosiur
dc.contributor.authorZahan, Md. Sarwar
dc.contributor.authorSarkar, Prosannajid
dc.contributor.authorAlam M.R.
dc.contributor.authorIslam, Wazedul
dc.contributor.authorLiza, Farhana Akhter
dc.contributor.authorIslam, Majharul
dc.contributor.authorRashid, Md. Mamunur
dc.contributor.authorTabashsum, Anika
dc.contributor.authorMahdee, Chowdhury Mashrur
dc.contributor.authorSahriar, Fahim
dc.contributor.departmentBRAC Institute of Educational Development
dc.date.accessioned2026-08-23T06:01:58Z
dc.date.available2026-08-23T06:01:58Z
dc.date.issued2025-12-01
dc.description.abstractBackground Hypertension (HT) and diabetes mellitus (DM) are two major noncommunicable diseases (NCDs) with a high rate of comorbidity that utilize similar health system resources. Limited evidence exists, however, on the level of readiness of health facilities in Bangladesh to manage HT and integrated HT–DM care. The objective of this study was an assessment of facility readiness for HT and integrated HT–DM management and to identify key factors influencing levels of readiness. Methods The study involved the analysis of data from 382 health facilities at or above sub-district level from the most recent nationally representative dataset, the 2017 Bangladesh Health Facility Survey (BHFS). Readiness for HT and integrated HT–DM services was assessed based on composite scores as constructed from the WHO–Service Availability and Readiness Assessment (SARA) indicators. Negative binomial regression models were applied to determine the factors associated with facility readiness. Results Facilities showed low readiness scores for both HT and integrated HT–DM care, with mean scores of 3.72 (out of 8) and 6.71 (out of 16), respectively. Although most facilities have basic equipment like BP apparatuses (98.7%) and stethoscopes (98.8%), a huge gap is observed in the training of staff (20.5%) and availability of guidelines for management (16.6%) of HT, diagnostic tools for DM, and essential medicines including ACE inhibitors (7.3%), thiazide diuretics (12.0%), and metformin (49.4%). Significant determinants of HT readiness included type of facility, client feedback system, and the number of HT care providers, while for integrated HT-DM readiness, important predictors were a type of facility, treatment-only service provision, client feedback mechanism, and structure of user-fees. Conclusions In Bangladesh, health facilities are still not adequately ready to deliver integrated HT-DM services, illustrating deficits in human resources, clinical protocols, diagnostics, and availability of medicines at an overall system level. There are several areas that need improvement-the need for strengthening integrated training, free availability of medicines, client feedback systems, and collaboration between the public-private-NGO sectors. The results, though based on 2017 data, remain important in capturing system readiness prior to the reform and serve as a nationally representative baseline to assess the upspring of HT and NCD program improvements in Bangladesh. © 2025 Jisan et al. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
dc.description.versionPublished
dc.format.extent11 pages
dc.identifier.citationJisan J-E-M, Rahman M, Zahan MS, Sarkar P, Alam MR, Islam W, et al. (2025) Assessing readiness of health facilities for hypertension and integration with diabetes care in Bangladesh: Evidence from the National Service Provision Assessment Survey. PLoS One 20(12): e0339405. https://doi.org/10.1371/journal.pone.0339405
dc.identifier.doi10.1371/journal.pone.0339405
dc.identifier.issn19326203
dc.identifier.other2-s2.0-105025146549
dc.identifier.urihttps://hdl.handle.net/10361/29443
dc.language.isoen_US
dc.publisherPublic Library of Science
dc.relation.hasversion10.1371/journal.pone.0339405
dc.relation.ispartofPlos One
dc.relation.ispartofseriesPlos One
dc.relation.journalPLOS ONE
dc.relation.urihttps://journals.plos.org/plosone/article?id=10.1371/journal.pone.0339405
dc.rightstrue
dc.subjectBangladesh
dc.subjectDelivery of health care
dc.subjectIntegrated
dc.subjectDiabetes mellitus
dc.subjectHealth facilities
dc.subjectHumans
dc.subjectHypertension
dc.subject.lcshHypertension.
dc.subject.lcshDiabetes--Treatment--Bangladesh.
dc.subject.lcshHealth facilities--Bangladesh.
dc.titleAssessing readiness of health facilities for hypertension and integration with diabetes care in Bangladesh: Evidence from the National Service Provision Assessment Survey
dc.typeArticle
oaire.citation.issue12 December
oaire.citation.volume20
person.affiliation.nameUniversity of Rajshahi
person.affiliation.nameUniversity of Rajshahi
person.affiliation.nameBRAC University
person.affiliation.nameBegum Rokeya University
person.affiliation.nameUniversity of Rajshahi
person.affiliation.nameUniversity of Rajshahi
person.affiliation.nameUniversity of Rajshahi
person.affiliation.nameUniversity of Rajshahi
person.affiliation.nameJatiya Kabi Kazi Nazrul Islam University
person.affiliation.nameUniversity of Rajshahi
person.affiliation.nameUniversity of Rajshahi
person.affiliation.nameUniversity of Rajshahi
person.identifier.orcid0000-0002-0612-8369
person.identifier.orcid0000-0002-6132-9876
person.identifier.orcid0009-0003-1772-3475
person.identifier.scopus-author-id60245826700
person.identifier.scopus-author-id55457953000
person.identifier.scopus-author-id57627178200
person.identifier.scopus-author-id35099619100
person.identifier.scopus-author-id7401492880
person.identifier.scopus-author-id60245868400
person.identifier.scopus-author-id59475584900
person.identifier.scopus-author-id60390532500
person.identifier.scopus-author-id58712941000
person.identifier.scopus-author-id59255091800
person.identifier.scopus-author-id59255155900
person.identifier.scopus-author-id60245949700

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Assessing readiness of health facilities for hypertension and integration with diabetes care in Bangladesh Evidence from the National Service Provision Assessment Survey.pdf
Size:
453.5 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: