dc.contributor.author | Synthesis Architects Limited | |
dc.date.accessioned | 2024-12-04T06:13:28Z | |
dc.date.available | 2024-12-04T06:13:28Z | |
dc.date.copyright | ©Synthesis Architects Limited 2023 | |
dc.date.issued | 2023-05-21 | |
dc.identifier.other | Design no.: 04 | |
dc.identifier.other | Design no.: 05 | |
dc.identifier.uri | http://hdl.handle.net/10361/24868 | |
dc.description | This record contains drawings of Brac University New Campus Project. It consists of PDF version of drawings. | en_US |
dc.description.tableofcontents | RFC 004 - Revision G - Electrical; D.N. 04 - RFC 004 - Revision G - 9th floor lighting and switchboard conduit layout plan; D.N. 05 - RFC 004 - Revision G - Electrical light circuit diagram. | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | Electrical light circuit | en_US |
dc.subject | Switchboard conduit | en_US |
dc.subject | Layout plan | en_US |
dc.subject | Request for change (RFC) | en_US |
dc.title | RFC 004 Electrical light circuit diagram (Revision G) | en_US |
dc.type | Drawings | en_US |