dc.contributor.author | BUCG-ABC Joint Venture (BUCG-ABC JV) | |
dc.date.accessioned | 2024-03-20T06:36:32Z | |
dc.date.available | 2024-03-20T06:36:32Z | |
dc.date.copyright | ©2023 | |
dc.date.issued | 2023-07-01 | |
dc.identifier.other | Design no.: A013-9 | |
dc.identifier.other | Design no.: A013-10 | |
dc.identifier.other | Design no.: A013-11 | |
dc.identifier.other | Design no.: A013-12 | |
dc.identifier.uri | http://hdl.handle.net/10361/22539 | |
dc.description | This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings. | en_US |
dc.description.tableofcontents | Cut-off ditch in the south of utility building; The details of cut-off ditch; The manhole-details; The cut-off ditch details | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | |
dc.subject | Architectural drawings | |
dc.subject | As built drawings | |
dc.subject | Cutt- off ditch | |
dc.title | Cut-off ditch for UB (Architectural As Built Drawings) | en_US |
dc.type | Drawings | en_US |