Toggle navigation
Login
Library Home
Toggle navigation
View Item
BracU IR
Brac University New Campus Development Project
Drawing & Designs
Architectural Drawing & Designs
As Built Drawings
Contractor As Built Drawings
View Item
BracU IR
Brac University New Campus Development Project
Drawing & Designs
Architectural Drawing & Designs
As Built Drawings
Contractor As Built Drawings
View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.
Cut-off ditch for UB (Architectural As Built Drawings)
View/
Open
D.N. A013-9 - Cut-off ditch in the south of utility building - 01.07.23.pdf (276.0Kb)
D.N. A013-10 - The details of cut-off ditch - 01.07.23.pdf (440.9Kb)
D.N. A013-11 -The manhole-details - 01.07.23.pdf (332.4Kb)
D.N. A013-12 - The cut-off ditch details - 01.07.23.pdf (273.7Kb)
Date
2023-07-01
Publisher
Brac University
Author
BUCG-ABC Joint Venture (BUCG-ABC JV)
Metadata
Show full item record
URI
http://hdl.handle.net/10361/22539
Table of Contents
Cut-off ditch in the south of utility building; The details of cut-off ditch; The manhole-details; The cut-off ditch details
Keywords
New campus project
;
Architectural drawings
;
As built drawings
;
Cutt- off ditch
Description
This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Type
Drawings
Collections
Contractor As Built Drawings
[65]
Policy Guidelines
BracU Policy
Publisher Policy
Search BracU IR
This Collection
Browse
All of BracU Institutional Repository
Communities & Collections
By Issue Date
Authors
Titles
Subjects
This Collection
By Issue Date
Authors
Titles
Subjects
My Account
Login
Register