dc.contributor.author | BUCG-ABC Joint Venture (BUCG-ABC JV) | |
dc.date.accessioned | 2024-03-14T07:11:24Z | |
dc.date.available | 2024-03-14T07:11:24Z | |
dc.date.copyright | ©2023 | |
dc.date.issued | 2020-01-06 | |
dc.identifier.other | Design no.: BRACU-BPD-01 | |
dc.identifier.other | Design no.: BRACU-RSI-01 | |
dc.identifier.other | Design no.: BRACU-LDS-01 | |
dc.identifier.uri | http://hdl.handle.net/10361/22499 | |
dc.description | This record contains plumbing as-built drawings of the Brac University New Campus Project. It consists of DWG versions of drawings. | en_US |
dc.description.tableofcontents | Pump room layout for roof playground irrigation system; Roof lon area drainage system drawing; Roof sprinkler irrigation system drawing | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | Plumbing drawings | en_US |
dc.subject | As built drawings | en_US |
dc.subject | Roof | en_US |
dc.subject | Irrigation | en_US |
dc.subject | Drainage system | en_US |
dc.title | Roof irrigation & drainage system as-built drawing of BRAC University New Campus Project for RAJUK | en_US |
dc.type | Drawings | en_US |