dc.contributor.author | WEB Structures | |
dc.date.accessioned | 2023-10-05T05:51:10Z | |
dc.date.available | 2023-10-05T05:51:10Z | |
dc.date.copyright | ©2020 | |
dc.date.issued | 2020-03-23 | |
dc.identifier.other | Design no.: BRACU-ST/BD.A1 | |
dc.identifier.other | Design no.: BRACU-ST/CD.A1 | |
dc.identifier.uri | http://hdl.handle.net/10361/21641 | |
dc.description | This record contains as-built drawing of RCC (Reinforced Cement Concrete) structure of Brac University New Campus Project. It consists of PDF & DWG version of drawings. | en_US |
dc.format.extent | 1 page | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | Structural drawing | en_US |
dc.subject | Structural designs | en_US |
dc.subject | As-built drawing | en_US |
dc.subject | RCC structure | en_US |
dc.subject | Utility building | en_US |
dc.title | Cut-off ditch in the south of utility building of BRAC University new campus project | en_US |
dc.type | Drawings | en_US |