East-North entrance of BRAC University new campus project
View/ Open
Date
2022-12-30Publisher
Brac UniversityAuthor
WEB StructuresMetadata
Show full item recordTable of Contents
Bored piles layout of the East secondary entrance; Pile caps of the East secondary entrance; Plan of column of the East secondary entrance; Plan of the East secondary entrance (SSL=84.860); Beam details of the East secondary entrance (SSL=84.860); Slab rebar of the East secondary entrance (SSL=84.860); Plan beam details and slab reinforcement of the East secondary entrance(SSL=88.210); Details 1 of the East secondary entrance; Details 2 of the East secondary entrance
Keywords
New campus project; Structural drawing; Structural designs; As-built drawing; RCC structure; Entrance; East-North entrance; Pile capDescription
This record contains as-built drawing of RCC (Reinforced Cement Concrete) structure of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.Type
DrawingsCollections
- As Built Drawings [67]