AST 1 plan & section of BRAC University new campus project
dc.contributor.author | WEB Structures | |
dc.date.accessioned | 2023-10-03T04:46:09Z | |
dc.date.available | 2023-10-03T04:46:09Z | |
dc.date.copyright | ©2022 | |
dc.date.issued | 2022-12-30 | |
dc.identifier.other | Design no.: BRACU-ST/AST1.01 | |
dc.identifier.uri | http://hdl.handle.net/10361/21509 | |
dc.description | This record contains as-built drawing of RCC (Reinforced Cement Concrete) structure of Brac University New Campus Project. It consists of both PDF and DWG version of drawings. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | Structural drawing | en_US |
dc.subject | Structural designs | en_US |
dc.subject | RCC structure | en_US |
dc.subject | As-built drawing | en_US |
dc.subject | AST 1 | en_US |
dc.subject | AST | |
dc.subject | Aboveground Storage Tank | |
dc.title | AST 1 plan & section of BRAC University new campus project | en_US |
dc.type | Drawings | en_US |
Files in this item
This item appears in the following Collection(s)
-
As Built Drawings [67]