dc.contributor.author | Electro-Mechanical Control Services (EMCS) | |
dc.date.accessioned | 2023-10-02T07:03:02Z | |
dc.date.available | 2023-10-02T07:03:02Z | |
dc.date.copyright | ©2019 | |
dc.date.issued | 2019-04-20 | |
dc.identifier.other | Design no.: MP-P.04 | |
dc.identifier.other | Design no.: MP-P.04A | |
dc.identifier.other | Design no.: MP-P.22 | |
dc.identifier.uri | http://hdl.handle.net/10361/21489 | |
dc.description | This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings. | en_US |
dc.description.tableofcontents | Plumbing layout of basement-02; Sump collection layout for basement-02; Basement-01 driver's toilet drainage pipe shifting layout at basement-02 ceiling | |
dc.format.extent | 3 pages | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | MEP drawing | en_US |
dc.subject | MEP design | en_US |
dc.subject | Plumbing designs | en_US |
dc.subject | Plumbing drawing | en_US |
dc.subject | Consultant drawing | en_US |
dc.subject | Basement | en_US |
dc.subject | Drainage system | en_US |
dc.title | Plumbing layout of basement-02 | en_US |
dc.type | Drawings | en_US |