dc.contributor.author | BUCG-ABC Joint Venture (BUCG-ABC JV) | |
dc.date.accessioned | 2023-09-19T09:51:19Z | |
dc.date.available | 2023-09-19T09:51:19Z | |
dc.date.copyright | ©2022 | |
dc.date.issued | 2022-10-19 | |
dc.identifier.other | Ref. no.: RFA / 544_A | |
dc.identifier.uri | http://hdl.handle.net/10361/21029 | |
dc.description | This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings. | en_US |
dc.description.tableofcontents | Updated 6F-12F floor finish; Revised drawing about floor finish (6-9F); Revised drawing about floor finish (10-12F) | |
dc.format.extent | 4 pages | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | Architectural drawings | en_US |
dc.subject | Architectural designs | en_US |
dc.subject | Contractor shop drawing | en_US |
dc.subject | Floor finish plan | en_US |
dc.title | Updated 6F-12F floor finish (RFA-544_Rev.A) | en_US |
dc.type | Drawings | en_US |