Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
Keywords
New campus project; Architectural drawings; Architectural designs; Contractor shop drawing; Y-column; Painting works; Color codeDescription
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.Type
DrawingsCollections
- Approved Drawings [225]