dc.contributor.author | BUCG-ABC Joint Venture (BUCG-ABC JV) | |
dc.date.accessioned | 2023-09-19T04:39:15Z | |
dc.date.available | 2023-09-19T04:39:15Z | |
dc.date.copyright | ©2023 | |
dc.date.issued | 2023-07-15 | |
dc.identifier.other | Ref. no.: RFA-577-A | |
dc.identifier.other | Design no.: BRACU-AR-JD-01-5 | |
dc.identifier.uri | http://hdl.handle.net/10361/21000 | |
dc.description | This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings. | en_US |
dc.description.tableofcontents | Technical specification of W06 and W07 wall and window joint fixing; Curtain wall detail; Curtain wall detail | |
dc.format.extent | 4 pages | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | Architectural drawings | en_US |
dc.subject | Architectural designs | en_US |
dc.subject | Contractor shop drawing | en_US |
dc.subject | Curtain wall | en_US |
dc.title | Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) | en_US |
dc.type | Drawings | en_US |