dc.contributor.author | Harbour Developments & Constructions Limited | |
dc.date.accessioned | 2023-09-17T04:39:47Z | |
dc.date.available | 2023-09-17T04:39:47Z | |
dc.date.copyright | ©2023 | |
dc.date.issued | 2023-02-18 | |
dc.identifier.other | Ref. no.: RFA-01 | |
dc.identifier.other | Design no.: GF-P01 | |
dc.identifier.other | Design no.: GF-P02 | |
dc.identifier.uri | http://hdl.handle.net/10361/20936 | |
dc.description | This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings. | en_US |
dc.description.tableofcontents | Ground storey-01 (RL-86.510 to 89.660) Ground floor working drawing with sample of paving block (200x100x50) from Mirpur Ceramic red color; GF floor finishes schedule (east wing); GF floor finishes schedule (west wing); GF working drawing; Section 1; Section 2 | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | Architectural drawings | en_US |
dc.subject | Architectural designs | en_US |
dc.subject | Contractor shop drawing | en_US |
dc.subject | Paving block | en_US |
dc.subject | Ground floor | en_US |
dc.title | Ground floor working drawing HDCL (RFA-01) | en_US |
dc.type | Drawings | en_US |