dc.contributor.author | BUCG-ABC Joint Venture (BUCG-ABC JV) | |
dc.date.accessioned | 2023-08-31T08:04:37Z | |
dc.date.available | 2023-08-31T08:04:37Z | |
dc.date.copyright | ©2020 | |
dc.date.issued | 2020-07-08 | |
dc.identifier.other | Ref.: BUCG-ABC JV/BRACU/113/20 | |
dc.identifier.uri | http://hdl.handle.net/10361/20286 | |
dc.description | This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building. | en_US |
dc.format.extent | 2 pages | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | General correspondence | en_US |
dc.subject | Time extension | en_US |
dc.subject | 6th floor | en_US |
dc.subject | 8th floor | en_US |
dc.subject | IFC drawings | |
dc.title | Time extension of design change for 6th-8th floor | en_US |
dc.type | General correspondence | en_US |