Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
dc.contributor.author | Brac University | |
dc.date.accessioned | 2023-08-27T09:33:47Z | |
dc.date.available | 2023-08-27T09:33:47Z | |
dc.date.copyright | ©2022 | |
dc.date.issued | 2022-07-05 | |
dc.identifier.other | No.: BRACU-NCP/2022/073A | |
dc.identifier.uri | http://hdl.handle.net/10361/19988 | |
dc.description | This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project. | en_US |
dc.format.extent | 1 page | |
dc.language.iso | en | en_US |
dc.publisher | Brac University | en_US |
dc.rights | This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. | |
dc.subject | New campus project | en_US |
dc.subject | General correspondence | en_US |
dc.subject | Piping works | en_US |
dc.title | Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts | en_US |
dc.type | General correspondence | en_US |
Files in this item
This item appears in the following Collection(s)
-
2022 [184]