Now showing items 76-95 of 221
-
Progressing report about fire protecting coat, request advance payment
(Brac University, 2020-07-02) -
Proposal resubmission of VO#010 for steel structure works
(Brac University, 2020-01-08) -
Propose the new executive project manager from BUCG-ABC JV for the construction of BRACU new campus project
(Brac University, 2020-12-11) -
Re: Accident or injury to the workmen
(Brac University, 2020-02-06) -
Re: All the M&E design immediately to be reviewed by the Transsolar
(Brac University, 2020-06-12) -
Re: Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
(Brac University, 2020-02-04) -
Re: Clarification about scope of intumescent paint
(Brac University, 2020-03-07) -
Re: Clarification about scope of intumescent paint
(Brac University, 2020-03-01) -
Re: Completing all the M&E design immediately to be reviewed by Transsolar
(Brac University, 2020-06-15) -
Re: Consequences of a public works project refers to BRACU-NCP-2019-114A
(Brac University, 2020-10-04) -
Re: Contractor's All Risk insurance
(Brac University, 2020-08-08) -
Re: Defects and deficiencies in the works
(Brac University, 2020-03-07) -
Re: Instruction regarding VO#19 rain chain & cut-off ditch work
(Brac University, 2020-10-08) -
Re: Missing of scrap materials from project site
(Brac University, 2020-06-25) -
Re: Missing of scrap materials from project site
(Brac University, 2020-07-05) -
Re: Observation on the electrical design drawings and BOQ
(Brac University, 2020-01-19) -
Re: Outstanding design conditions as of 27 April, 2020
(Brac University, 2020-05-12) -
Re: Providing material samples for the structure construction, pre-opening and pre-embedding work
(Brac University, 2020-01-05) -
Re: Quarantine for returnees and new arrivals from China
(Brac University, 2020-02-12) -
Re: Regarding cable laying work by DESCO through the project
(Brac University, 2020-07-18)