Re: Observation on the electrical design drawings and BOQ
(Brac University, 2020-01-19) -
Re: Outstanding design conditions as of 27 April, 2020
(Brac University, 2020-05-12) -
Re: Providing material samples for the structure construction, pre-opening and pre-embedding work
(Brac University, 2020-01-05) -
Re: Quarantine for returnees and new arrivals from China
(Brac University, 2020-02-12) -
Re: Regarding cable laying work by DESCO through the project
(Brac University, 2020-07-18) -
Re: Regarding Contractor's All Risk insurance
(Brac University, 2020-07-21) -
Re: Regarding rebar requisition no. M-38 and M-39
(Brac University, 2020-07-08) -
Re: Regarding security issues of the project
(Brac University, 2020-07-25) -
Re: Regarding site cleaning, keeping healthy environment at the BRACU project site
(Brac University, 2020-08-22) -
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
(Brac University, 2020-07-12) -
Re: Regarding withdrawal of suspension of project work
(Brac University, 2020-06-11) -
Re: Regarding withdrawal of suspension of project work
(Brac University, 2020-06-30) -
Re: Reminder of submitting the coordinated drawing on M&E design
(Brac University, 2020-06-17) -
Re: Request for submitting shop drawing for PV roof and jogging track steel structure
(Brac University, 2020-03-09) -
Re: Resumption of project work
(Brac University, 2020-06-01) -
Re: Submission of technical documents under design services agreement rev.01
(Brac University, 2020-03-15) -
Re: Submission of technical documents under design services agreement rev.01
(Brac University, 2020-03-11) -
Re: Submitting final design, drawing and BOQ of facade for BRACU new campus project
(Brac University, 2020-02-06) -
Re: Submitting list of manpower
(Brac University, 2020-02-04) -
Re: Taking over of newly purchased land by the contractor