Regarding PV roof of BRAC University new campus project
(Brac University, 2020-02-22) -
Steel structure works for catwalk & spiral stair
(Brac University, 2020-02-23) -
Resumption of work from quarantine
(Brac University, 2020-02-25) -
Clarification about scope of intumescent paint
(Brac University, 2020-02-25) -
Initial observation on the BMS system design drawings and BOQ
(Brac University, 2020-03-02) -
Submitting final design, drawing and BOQ of facade immediately
(Brac University, 2020-03-01) -
Instruction to take adequate safety measures on the pedestrian walkway at east side
(Brac University, 2020-03-01) -
Regarding issues that affect the execution of permanent retaining wall
(Brac University, 2020-03-04) -
Clarification about scope of intumescent paint
(Brac University, 2020-03-04) -
Request for submitting shop drawing for PV roof and jogging track steel structure
(Brac University, 2020-03-05) -
Keeping clean site, health and miscellaneous issue
(Brac University, 2020-03-05) -
Clarification on cost of renewing all risk insurance
(Brac University, 2020-03-09) -
Submission of technical documents under design services agreement rev.01
(Brac University, 2020-03-10) -
Submitting information of Chinese people at BRAC University new campus project
(Brac University, 2020-03-11) -
Submission of technical documents under design services agreement rev 01
(Brac University, 2020-03-14) -
Regarding the clarification of initial observation on the price offer for the facade work (variation order # 031)
(Brac University, 2020-06-23) -
Reminder to submit outstanding RFAs with EMCS
(Brac University, 2020-04-26) -
The paint system of BBMG
(Brac University, 2020-04-29) -
Financial proposal for facade work
(Brac University, 2020-05-08)