2019: Recent submissions
Now showing items 81-100 of 154
-
Breakdown of quotation of extra works for Brac University new campus
(Brac University, 2019-07-18) -
Submission of progress report In accordance with sub-clause 14.6 of GCC
(Brac University, 2019-05-17) -
Re-submission of construction schedule for the next three month (July-September 2019) based on actual work progress
(Brac University, 2019-05-13) -
Submission of detail quantity of pre-engineering steel section
(Brac University, 2019-05-13) -
The engineer’s observation and instruction regarding the quality of works
(Brac University, 2019-05-13) -
Request to change concrete grade C10 to C15 for lean blinding concrete
(Brac University, 2019-05-10) -
VO#09 Adjustment unit price request for prefabrication steel structure works
(Brac University, 2019-05-10) -
Regarding preparation during eid vacation
(Brac University, 2019-05-29) -
Extension of time to submit quotation for carryout the works under variations or extra works
(Brac University, 2019-06-23) -
Approval VO#13 adjustment unit price for planting reinforcement work
(Brac University, 2019-06-19) -
VO#12 - Adjustment unit price for damp proofing work in raft, pile cap, H-steel and king post
(Brac University, 2019-04-19) -
Regarding D-wall surface water leakage
(Brac University, 2019-05-13) -
Reminder of high strain dynamic Load test for piles
(Brac University, 2019-05-12) -
Reply against request for information (RFI) -033
(Brac University, 2019-05-12) -
VO#10 Quotation for additional steel structure fabrication
(Brac University, 2019-05-12) -
Prepare mock-up for different type of brick wall and circular column
(Brac University, 2019-05-08) -
Regarding selection of RMC plant
(Brac University, 2019-05-08) -
Reimbursement of utility bills
(Brac University, 2019-05-07)