Suggestion about structure pile test
(Brac University, 2019-03-27) -
Instruction to submit supply schedule for pre-engineering steel section
(Brac University, 2019-03-16) -
Instruction to submit cash flow estimate
(Brac University, 2019-03-16) -
Valuation of rebar connection via mechanical coupler
(Brac University, 2019-03-13) -
Verified valuation for instrumentation and monitoring works
(Brac University, 2019-03-13) -
Response to RFI No.JV-BRACU-RFI-028
(Brac University, 2019-03-13) -
Response to the letter for amendment of depth of earth excavation
(Brac University, 2019-03-13) -
Request to amend depth of earth excavation
(Brac University, 2019-03-10) -
Regarding mix design of concrete from BUET
(Brac University, 2019-03-10) -
Engineer’s instructions to submit method statement for construction of 300mm additional wall
(Brac University, 2019-04-04) -
Shipment of pre-fabricated steel building (Shipment of steel structure against LC no. 0000021619010057 dated: 26.02.19)
(Brac University, 2019-03-27) -
Response to RFA 095 regarding approved sample of membrane
(Brac University, 2019-03-31) -
Quotations for the extra works listed in the letter BRACU-NCP/2019/89A, dated 06th August 2019
(Brac University, 2019-09-08) -
Submitting the present status about MEP and related works as per scope of services, BRACU new campus project
(Brac University, 2019-03-10)