2019: Recent submissions
Now showing items 1-20 of 154
-
Piping material for conduiting work in audio visual, PA, IT and security access
(Brac University, 2019-12-26) -
Structural steel works from 6th to 12th floor
(Brac University, 2019-12-24) -
Issuing NCR (Non-conformance report) for BRACU new campus project
(Brac University, 2019-12-24) -
VO#20 Approval of unit rates for rebar welding works connected to plate of steel column
(Brac University, 2019-12-18) -
Preparing master schedule – BRACU new campus project
(Brac University, 2019-12-17) -
Resubmission of VO # 09 for steel structure works
(Brac University, 2019-12-17) -
Construction of strengthening wall attached to diaphragm wall
(Brac University, 2019-12-14) -
Piping material for audio visual & PA, IT system. security access control system works
(Brac University, 2019-01-14) -
Construction of shore pile in zone C
(Brac University, 2019-12-14) -
Plaster on the strengthening wall
(Brac University, 2019-12-10) -
List of RFA which are pending comment concurrence from EMCS
(Brac University, 2019-12-07) -
Providing material samples for the structure construction, pre-opening and pre-embedding works
(Brac University, 2019-12-07) -
Submission of monthly progress report (MPR)
(Brac University, 2019-12-05) -
Submission of updated master schedule
(Brac University, 2019-01-05) -
Consideration in the electrical system design work
(Brac University, 2019-12-04) -
The engineer's observation and instruction regarding health of the personnel
(Brac University, 2019-11-09) -
VO.22 – Approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works’
(Brac University, 2019-11-25) -
Submitting inspection checklist for concreting, structural steel and other major works
(Brac University, 2019-11-20) -
Submitting revised offer for the variation order # 09 and # 10
(Brac University, 2019-11-18)