Variation Orders: Recent submissions
Now showing items 21-40 of 47
-
Proposal for ceramic tiles installaton works
(Brac University, 2022-03-08) -
Proposal for changing the item of work for water treatment plant system
(Brac University, 2020-11-18) -
Steel structure work for catwalk & spiral stair
(Brac University, 2019-01-13) -
Proposal of steel structure form 6th to 12th Story and above works
(Brac University, 2019-01-20) -
Steel structure work for catwalk & spiral stair
(Brac University, 2019-01-13) -
Rebar welding at permanent caping in D-wall
(Brac University, 2019-01-09) -
MS pipe for conducting for AV. PA, IT system, security access control and fire detection cabling work
(Brac University, 2019-01-04) -
BracU approval for some electric elements samples to be submitted for approval
(Brac University, 2019-11-18) -
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
(Brac University, 2019-11-16) -
Additional wall attached to diaphragm wall
(Brac University, 2019-10-14) -
Approval of rebar welding works connected to plate of steel column
(Brac University, 2019-10-05) -
Approval of unit price
(Brac University, 2019-07-09) -
Approval of extra unit price for RCC work
(Brac University, 2019-07-20) -
Approval of non -schedule item water proofing works at foundation
(Brac University, 2019-10-07) -
Approval of unit price for pile splicing
(Brac University, 2019-05-22) -
Unit price approval-planting reinforcing works
(Brac University, 2019-05-13) -
Steel structure work for catwalk & spiral stair
(Brac University, 2019-01-13) -
Valuation of rebar connection via mechanical coupler
(Brac University, 2019-03-07) -
Approval of instrumentation & monitoring works
(Brac University, 2019-03-07)