Brac University New Campus Development Project: Recent submissions
Now showing items 661-680 of 2659
-
Architectural shop drawing of west secondary entrance (RFA-265_Rev G)
(Brac University, 2022-01-27) -
Proposal for ceramic tiles installaton works
(Brac University, 2022-03-08) -
Architectural shop drawing of box drain (RFA-263_Rev H)
(Brac University, 2022-08-29) -
Proposal for changing the item of work for water treatment plant system
(Brac University, 2020-11-18) -
Architectural shop drawing of box drain (RFA-263_Rev G)
(Brac University, 2022-07-27) -
Steel structure work for catwalk & spiral stair
(Brac University, 2019-01-13) -
Proposal of steel structure form 6th to 12th Story and above works
(Brac University, 2019-01-20) -
Steel structure work for catwalk & spiral stair
(Brac University, 2019-01-13) -
Rebar welding at permanent caping in D-wall
(Brac University, 2019-01-09) -
MS pipe for conducting for AV. PA, IT system, security access control and fire detection cabling work
(Brac University, 2019-01-04) -
Architecture drawing of PT1 & PT2 (RFA-528_Rev.B)
(Brac University, 2022-12-27) -
BracU approval for some electric elements samples to be submitted for approval
(Brac University, 2019-11-18) -
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
(Brac University, 2019-11-16) -
Introduction of brick (9.5”×4.5”×2.75”) (RFA-262_Rev B)
(Brac University, 2021-08-30) -
Additional wall attached to diaphragm wall
(Brac University, 2019-10-14) -
Architecture drawing of AT7 & AT8 (RFA-529_Rev.B)
(Brac University, 2022-10-13) -
Architectural shop drawing of CC5 setting out for ST9 (RFA-225_Rev B)
(Brac University, 2019-12-11) -
VIP change room+CT1+UT1 (RFA-530_Rev.C)
(Brac University, 2022-10-21) -
Architectural shop ground storey & topography level (RFA-220_Rev A)
(Brac University, 2019-12-05)