Brac University New Campus Development Project: Recent submissions
Now showing items 221-240 of 2652
-
Aluminum window W02&W03 (RFA-444_Rev D)
(Brac University, 2022-12-29) -
Shop drawing of BK-1(1F) (RFA-448_Rev B)
(Brac University, 2022-08-10) -
Material samples & mock-up & technical specification of water repellent (RFA-447_Rev E)
(Brac University, 2022-02-27) -
12F floor tiles layout and finishes ( RFA-445_Rev D)
(2022-06-03) -
Shop drawing of BK-1(2F) (RFA-443_Rev B)
(Brac University, 2022-08-10) -
CM6, CC4 Emulsion paint of materials sealer & putty (RFA 442 _Rev B)
(Brac University, 2021-12-25) -
Structural & architectural shop drawing-planter cum bench type 1 (RFA-440_Rev A)
(Brac University, 2021-12-12) -
Brick wall layout of toilet AT1.AT2 6F-12F (RFA-437_Rev D)
(Brac University, 2021-01-04) -
Glass door and metal door color (RFA-435_Rev A)
(2021-11-20) -
Timber door color (RFA-434_Rev A)
(2021-11-17) -
Material of aluminum angle & aluminum divider (RFA-443_Rev C)
(Brac University, 2021-12-26) -
Cut-off ditch in the south of utility building of BRAC University new campus project
(Brac University, 2020-03-23) -
Main entrance of BRAC University new campus project
(Brac University, 2022-12-30) -
Roof architectural finishes (RFA-426_Rev A)
(2021-07-16) -
Retaining wall of entrance of BRAC University new campus project
(Brac University, 2022-12-30) -
West-North entrance of BRAC University new campus project
(Brac University, 2022-12-30) -
Other structure of auditorium wall, fins and lecture theatre of BRAC University new campus project
(Brac University, 2022-12-30) -
East-North entrance of BRAC University new campus project
(Brac University, 2022-12-30) -
10F-12F Architectural finishes (RFA-425_Rev A)
(Brac University, 2021-07-16) -
Entrance piles plan of BRAC University new campus project
(Brac University, 2022-12-30)