Brac University New Campus Development Project: Recent submissions
Now showing items 1-20 of 2638
-
100 series layout drawing (Dwm4 Intrends Limited)
(Brac University, 2024-01-27) -
8th and 9th floor fInish & acoustic panels
(Brac University, 2023-05-28) -
Library floor fInish roll vinyl
(Brac University, 2023-06-15) -
Library design print
(Brac University, 2023-06-14) -
RFC 011 Architectural drawing of Ayesha Abed Library (Revision A )
(Brac University, 2023-08-23) -
RFC 010 MEP drawing (Revision A)
(Brac University, 2023-08-02) -
RFC 009 RCP 9th floor plan (Revision A)
(Brac University, 2023-08-08) -
RFC 008 Civil works (Revision C)
(Brac University, 2023-07-11) -
RFC 007 HVAC system (Revision E)
(Brac University, 2023-05-22) -
RFC 006 Fire extinguisher layout drawing (Revision F)
(Brac University, 2023-02-28) -
RFC 001 Presentation drawing 9th floor plan (Revision B)
(Brac University, 2023-04-23) -
RFC 002 8th and 9th floor plan (Revision C)
(Brac University, 2023-04-18) -
RFC 005 IT 9th floor routing plan (Revision E)
(Brac University, 2023-05-08) -
RFC 004 Electrical light circuit diagram (Revision G)
(Brac University, 2023-05-21) -
Plumbing layout of roof storey of BRAC University New Campus
(BRAC University, 2023-07-01) -
PT1+PT2- public toilet (Architectural As Built Drawings)
(Brac University, 2023-07-01) -
Plumbing layout of 12th storey of BRAC University New Campus
(BRAC University, 2023-07-01)